Scope of work: A Є3 bn. Investment by Shell was threatened by closure following release of peat (250 NTU) and aluminium rich clay (50 mgl-1) into Carrowmore Lake. |
|
Solution: Surface water was collected in a tailings pond and treated by ECR, flocculation and settlement (radial clarifier). Treated water had to comply |
|
Results: |
|
|---|---|
Major plant failures (2005 – present) |
None |
Quality Compliance |
>99% |
Design flow rate (MLd-1) |
1 |
Total electrode area (m2) |
2.0 |
Equivalent Al3+ generation (mgl-1) |
4.75 |
Comments: Original plant was built to last 12 months – it still operates 24/7 at peak flow rates of 1.5 Mld-1 achieving <200 µl-1 Al3+ in treated water. The plant will be upgraded 2011 to include new ECR units and operated until start 2014. |
|